Hi Everyone,
I have this when I am trying to drag inside another task it does not allow me.
I am also attaching a video with a demonstration thanks.
https://www.loom.com/share/7d929fd810614ab1940afbde45666fa6
Hi Everyone,
I have this when I am trying to drag inside another task it does not allow me.
I am also attaching a video with a demonstration thanks.
https://www.loom.com/share/7d929fd810614ab1940afbde45666fa6
Hi Ghulam,
Thank you for considering my request.
In our project, each task has a specific position in the Gantt(list), based on its priority/start-date(or any other thing) some are on top and some are at the bottom, to reposition each task we should be able to drag a task and place it at the top of the list, but doing so in Gantt it converts it into a new project.
Thanks for writing back to us, here's the ticket https://github.com/bryntum/support/issues/8780.