Hello,
we switched to Bryntum Scheduler from another product.
To show the boundaries for event shifts, we used a thin horizontal line that was exactly as long as the area that was allowed to be shifted.
For example: The event lasts one day, it must be completed within a certain week.
Looks like this (Ignore the dashed line, the thin black line going through the event is meant):
Of course, the limits are different for each event.
While moving the event, you can still see the line.
How can I achieve this with the bryntum scheduler?
Ralf