Skip to content
Bryntum Gantt
Power demos
Advanced
Shows a Gantt chart with many advanced options enabled
Big data set
Shows a Gantt chart with a large project and the option to generate a new dataset with an arbitrary size
Gantt + Scheduler Pro
Shows Gantt and Scheduler Pro sharing a project
Gantt + TaskBoard
thin
Shows Gantt and TaskBoard sharing a project
Portfolio planning with the Gantt chart
Shows how to visualize multiple projects in a portfolio inside a single Gantt chart
Realtime updates in Gantt
Shows changes made by other clients in real time
AI
AI-powered Gantt
Demonstrates the Bryntum AI Assistant integrated with the Gantt
Features
Basic setup
Shows the most simple Gantt setup - add a Gantt chart to your app in less than 30 lines of code
Auto-apply constraints to pin tasks
Loads a simple dataset where there is no information pinning the task to its startDate. Without the Project `autoSetConstraints`, tasks are scheduled as-soon-as-possible, meaning the project start date
Aggregation column
Shows how to aggregate values in a column
Construction
Shows project, resource and task cost values
Advanced filtering
Shows how to use FieldFilterPickerGroup for advanced filtering of a Gantt chart, synchronized with the Gantt Filter feature
Baselines
Illustrates usage of baselines
Highlighting task non-working time
Shows how to assign and visualize task calendars
Cell selection
Shows how cell selection features works in Gantt, including CellCopyPaste and FillHandle
Collapsible columns
A Gantt chart with collapsible grouped columns in its grid section
Critical paths
Illustrates usage of the critical paths visualization feature
Dependencies
Shows how to customize the Dependency drawing feature
Early render vs legacy render
Allows comparing the new early rendering mode used by default in Gantt to the old legacy mode
Facet filtering
Shows a filter panel that can filter to specific data values
Filtering
Shows the FilterBar feature which adds filter fields to the column headers
Fixed Columns
Fix important columns to always keep them in view
Grouping
Uses the TreeGroup feature to group the task tree by transforming the data
Grid Sections
The Bryntum Gantt chart lets you add multiple, individually scrollable grid sections. You can pin an extra section to the right of the schedule
Highlight time spans
Help end users understand the scheduling rules by visualizing the task scheduling boundaries
Inactive tasks
Shows inactive tasks behavior in the Gantt
Indicators
Demo shows built-in and custom date indicators on the task rows
Infinite timeline scrolling
Shows a infinitely scrollable Gantt chart
Labels
Shows extra informational labels docked round tasks
Multiple Gantt charts
Shows how to add multiple Gantt charts with synchronized timeline scrolling
Parent area
Shows a layer highlighting the area encapsulating all child tasks
Pin successors during drag drop
Shows how to move a task while keeping successors in place
Progress line
Shows project progress line
Responsive
Shows how Gantt can be easily made responsive using a combination of configs and styling
Rollups
Shows how to display rollups
Scheduling conflict resolution popup
Shows the Gantt chart´s built-in conflict resolution popup in action. It is displayed after a cyclic structure, constraint violation to let the user decide what to do
Scroll buttons
Shows a sticky button that scrolls the task into view quickly
Sparse index for tasks
This example demonstrates the sparse index feature in a Gantt chart
Split tasks
Shows the tasks split to segments that can be dragged and resized individually
Static mode
Shows the Engine static mode when certain fields automatic calculation is disabled which allows to load dirty data as-is
Storing and restoring state
This example demonstrates auto state handling for the gantt. It allows the user to store state in localStorage and restore it across page reloads
Stretch tasks to fill ticks
Shows the fillTicks config, which stretches tasks to fill ticks and adjusts non working time ranges to also fit the ticks
Summary feature
This example shows the summary feature
Time Ranges
Highlight important dates or time spans in the schedule
Time zone support
Shows how time zone support can be implemented
Undo/Redo
Shows a Gantt setup with undo/redo
Versions
Shows a Gantt setup with versioning
WBS
Shows the use of WBS column in a Gantt setup
Zooming
Demonstrates smooth zooming with zoom controls, TimeZoomSlider, and Gantt tasks
Planned percent done column
Illustrates the planned percent done column usage
Relative timeaxis
Shows how to show a relative timeaxis with integers instead of dates
Postponed conflicts
Shows an option to postpone resolution of certain scheduling conflicts and how to use custom constraints logic
S-curve
Demonstrates how the Gantt chart can show a customizable s-curve
Charts
Chart designer
thin
Shows how to use a chart designer widget to configure and display a chart from Gantt data
Export & import
Export to Excel
This demo shows a custom solution of exporting Gantt data to Excel without involving the server based on a third party library called write-excel-file (https://www.npmjs.com/package/write-excel-file)
Export to MS Project
This demo shows a custom solution of exporting Gantt data to Microsoft Project without involving the server
Import MS Project & Primavera P6 files
Shows how to import projects from MS Project and Primavera P6
Export to ICS
This demo shows how to export tasks to ICS format (iCal)
Export to PDF / PNG
Demonstrates how the Gantt chart can be exported to PDF/PNG
Print
Demonstrates how to print component using browser print dialog
Customization
Customizing task bar contents
Shows how to customize the rendering of the Gantt chart
Custom time axis header
You can easily define any number of header rows for the time axis
Customizing the resource assignment picker
Shows how to enhance the resource assignment picker
Customized task bar
Shows how to render a number value for each time axis tick below the task bar
Customizing layers
Shows how to move the different layers along the z-axis
Customized UI to support single resource assignment
Shows the most simple way to implement single assignment in the Gantt chart
Customizing the task editor with a rich text editor
Shows how to customize the task editor, using a TinyMCE field for the Notes tab
Customizing the task menu
Shows how to customize the items of the TaskMenu
Customizing the task styling
Shows how using eventColor affects appearance
Customized tooltips
Shows how to customize the task tooltip
Localization
All demos allows you to switch locale, but this demo has a german locale in addition
Theme browser
Try the included SASS themes
Custom Theme
This demo has a custom theme, to showcase how you can create your own. Check the resources/ folder to see how it is done
Drag drop
Drag resources from a grid
This example shows how easy it is to assign tasks to resources by dragging a resource from an external grid onto tasks in the Gantt chart
Drag resources from utilization panel
This example shows you can assign tasks to resources by dragging a resource from the utilization grid onto tasks in the Gantt chart
Drag unplanned tasks from a grid
This example shows how easy it is to drag tasks from a separate list or grid onto the Gantt chart
Drag tasks from AG Grid
Plan a 2027 Mars rocket launch by dragging unscheduled tasks from an AG Grid panel onto the Bryntum Gantt chart
Additional widgets
Resource histogram widget
Shows a resource allocation histogram below a Gantt
Resource utilization widget
Shows a resource utilization grid with editable resource assignment values below a Gantt chart
Timeline widget
Shows the Timeline widget for important tasks
Misc
Kitchen sink
thin
Comprehensive showcase of all the widgets included in the Bryntum package. Browse through text fields, date pickers, buttons, layouts, and more
Integration
Replace the task menu
A custom task menu implemented with Bootstrap
Include in CSP page
Shows the Gantt chart in CSP page
Include using EcmaScript module
This example shows how to include and use Gantt using EcmaScript modules (import)
ExtJS Modern App integration
ExtJS 6.5.3
Example of a Bryntum Gantt embedded in an ExtJS Modern application. Read more about ExtJS here:
https://www.sencha.com
JointJS Charts integration
Shows how to integrate Bryntum Gantt with JointJS Charts
Backend in PHP
The demo features existing advanced demo with sample PHP backend
Integrate with Salesforce Lightning
This demo shows how to embed Bryntum Gantt into the Lightning Web Component to use in your salesforce org
Include using a script tag
This example shows how to include and use the Gantt bundle using an ordinary script tag
Use as web component
This example shows how to use the Custom elements version of the gantt. Currently following browsers support custom elements: Chrome, Firefox, Opera, Safari
ASP.NET
Shows Gantt with .NET backend
ASP.NET Core
Shows Gantt with .NET Core backend
Custom build using WebPack
WebPack 5
This very basic demo shows how to use GanttBase and webpack to do a custom build from our sources
Custom thin build using WebPack
WebPack 5
thin
This very basic demo shows how to use GanttBase and webpack to do a custom build from our thin packages
Angular
examples/frameworks/angular
Advanced
Angular 21
TypeScript 5
This demo shows an advanced configuration of the Bryntum Angular Gantt chart in an Angular app
Inline data for Angular View Engine
Angular 11
TypeScript 4
Shows how to bind inline data to the Angular Gantt component
Baselines
Angular 13
TypeScript 4
Illustrates usage of baselines
Basic thin setup
Angular 16
TypeScript 5
thin
This example shows basic setup of the Bryntum Gantt using thin npm packages
Custom task bar
Angular 21
TypeScript 6
Shows how to render a number value for each time axis tick below the task bar
Drag from a grid
Angular 15
TypeScript 4
This example shows how easy it is to drag tasks from a separate list or grid onto the Gantt chart
Gantt + Resource Utilization
Angular 14
TypeScript 4
Shows how to use the angular Gantt chart wrapper partnered with Resource Utilization
Gantt + Scheduler Pro
Angular 13
TypeScript 4
Shows how to use the Angular Gantt chart wrapper partnered with Scheduler Pro
Inline data
Angular 13
TypeScript 4
Shows how to bind inline data to the Angular Gantt component
PDF/PNG export
Angular 15
TypeScript 4
This demo shows how to use export to PDF/PNG feature with the Angular Gantt control
Print
Angular 21
TypeScript 6
Demonstrates how to print component using browser print dialog
Rollups
Angular 15
TypeScript 4
Shows how to display rollups using the Angular Gantt component
Task editor customization
Angular 13
TypeScript 4
This demo shows how to customize the Angular Gantt chart´s task editor by adding a tab with attached files
Time ranges
Angular 15
TypeScript 4
Highlight important dates or time spans in the schedule using the Angular Gantt component wrapper
Undo/Redo
Angular 13
TypeScript 4
Shows a Gantt setup with undo/redo
React + Vite
examples/frameworks/react-vite
Baselines
React 19
Vite 6
TypeScript 5
Illustrates usage of baselines
Basic setup
React 19
Vite 8
TypeScript 6
This demo contains the React Gantt chart wrapper and the demo is written in TypeScript
Basic thin setup
React 18
Vite 5
TypeScript 5
thin
This example shows basic setup of the Bryntum Gantt using thin npm packages
Big data set with JSX task renderer
React 19
Vite 7
TypeScript 5
This demo shows a Gantt chart with a big data set using a custom React component as task renderer
Custom task bar
React 19
Vite 8
TypeScript 6
Shows how to render a number value for each time axis tick below the task bar
Gantt + Scheduler Pro
React 19
Vite 6
TypeScript 5
This demo shows how to use the React Gantt wrapper partnered with Scheduler Pro
Advanced
React 18
Vite 5
TypeScript 5
This demo shows how to use Bryntum Gantt chart React wrapper in an advanced configuration
Inline data
React 19
Vite 7
TypeScript 5
Shows how to bind inline data to the React component. The demo is written in TypeScript
PDF/PNG export
React 19
Vite 7
TypeScript 5
This demo shows how to export the React Gantt component to PDF
Print
React 19
Vite 8
TypeScript 6
Demonstrates how to print component using browser print dialog
rollups
React 19
Vite 7
TypeScript 5
This example shows how to display rollups in the React Gantt widget
timeline
React 19
Vite 7
TypeScript 5
Shows the React Gantt chart combined with Timeline widget
Time ranges
React 19
Vite 7
TypeScript 5
This example shows how to highlight important dates or time spans in the schedule in the React Gantt component
Undo/Redo
React 18
Vite 5
TypeScript 5
This demo shows a Gantt setup with undo/redo
React
examples/frameworks/react
Resource Histogram
React 17
This demo shows how to use Resource Histogram part of the React Gantt chart component
Task editor customization
React 16
Shows how to customize the task editor in the React Gantt chart wrapper
Redux toolkit
React 18
This demo contains a basic usage of React Redux Toolkit on Gantt
SharePoint Workbench with TypeScript
React 17
TypeScript 4
thin
This demo contains a Basic React Gantt example. The demo is written in TypeScript
React + Next.js
examples/frameworks/react-nextjs
Basic setup with NEXT.js app router
React 18
NextJS 15
TypeScript 5
This demo contains the React Gantt chart wrapper and the demo is written in Next.js using the App Router
Basic setup with NEXT.js pages router
React 18
NextJS 15
TypeScript 5
This demo contains the React Gantt chart wrapper and the demo is written in Next.js using the Pages Router
React + Remix
Basic setup
React 18
Remix 2
Vite 5
TypeScript 5
This demo contains the React Gantt chart wrapper and the demo is written in Remix using Typescript
Vue 3 + Vite
examples/frameworks/vue-3-vite
Basic setup
Vue 3
Vite 8
TypeScript 6
This example shows basic setup of the Bryntum Gantt
Basic thin setup
Vue 3
Vite 5
TypeScript 5
thin
This example shows basic setup of the Bryntum Gantt using thin npm packages
Undo/Redo
Vue 3
Vite 5
TypeScript 5
This demo shows a Gantt setup with undo/redo
Custom task bar
Vue 3
Vite 8
TypeScript 6
Shows how to render a number value for each time axis tick below the task bar
Print
Vue 3
Vite 8
TypeScript 6
Demonstrates how to print component using browser print dialog
Vue 3
examples/frameworks/vue-3
Baselines
Vue 3
Illustrates usage of baselines
Gantt + Scheduler Pro
Vue 3
This demo shows how to use Bryntum Gantt partnered with Scheduler Pro in Vue 3
Inline data
Vue 3
Shows how to bind inline data to the Vue 3 component
Simple setup
Vue 3
Shows a simple Gantt chart integration with Vue 3
Vue 3 + Nuxt
Basic setup (Nuxt)
Vue 3
NuxtJS 4
Vite 5
This example shows basic setup of the Gantt in Nuxt
Vue 2
examples/frameworks/vue-2
Advanced
Vue 2
This demo shows how to use the Vue Gantt chart control in an advanced configuration
Cell Renderer
Vue 2
Demo of Bryntum Gantt for Vue with column renderers outputting Vue components into cells
Gantt + Scheduler Pro
Vue 2
This demo shows how to use the Vue Gantt component partnered with Scheduler Pro
Inline data
Vue 2
Shows how to bind inline data to the Vue Gantt component
PDF/PNG export
Vue 2
Shows how to use the PDF export feature of the Vue Gantt component wrapper
Rollups
Vue 2
Shows how to display rollups in the Vue chart widget
Task editor customization
Vue 2
Shows how to customize the task editor in the Vue Gantt component
Time ranges
Vue 2
Shows how to display time ranges in the Vue Gantt chart component