Our state of the art Gantt chart


Post by uniyal.aakash »

I want to manually configure the calendar in Gantt chart to show the timeline between 2 dates only (which can be different from the top task) .

If i have configured 02-03-2022 till 02-03-2023 then the calendar view should only render the calendar for these dates no matter how the tasks are rendered.

This should also work with all the Preset Views.

Can this be configured and how ?


Post by alex.l »

Hi,

I am not sure what do you mean in "calendar view", I assume that is TimeAxis. In that case this is that you are looking for https://bryntum.com/docs/gantt/api/Scheduler/view/mixin/TimelineZoomable#config-zoomKeepsOriginalTimespan

All the best,
Alex


Post by uniyal.aakash »

Hey Alex, clarifying the same i wanted to ask if there is a way I can restrict the TIMEAXIS between a certain date ? like I want it to show only from lets say "1st Jan 2020" to "7th Jan 2021" (Only this much time axis should be visible all the time).


Post by alex.l »

Did you check the config I recommended? It feels like that's what you are looking for

All the best,
Alex