Hello, I am experiencing a bug when trying to set tasks to manually scheduled. Whenever I set a task to manually scheduled, move it, and then try to set another task as manually scheduled, the previous task moves automatically. I need to then cancel the operation and do it again so that it doesn't move. I was wondering if there is a way to prevent this from happening.

I am attaching a video showing what I did as well as a test case. Thanks again for your time.

test_case.json
(7.25 KiB) Downloaded 44 times
Test Video.mp4
(22.98 MiB) Downloaded 51 times

Post by arcady »

That looks bad but I cannot reproduce the issue on the current version.
I put the provided dataset to the advanced demo and it worked as expected.
Please provide a runnable test case or steps how we can reproduce that on some of our demos.