Post by takafumi ohtake »

It can be reproduced at https://bryntum.com/examples/gantt/resourcehistogram/.

Shifting time range of the Gantt timeline doesn't refresh vertical lines in the resource histogram timeline.

If there is a workaround to refresh vertical lines, please tell me.

not-refresh-lines.mp4
(657.1 KiB) Downloaded 65 times

Post by alex.l »

Reproduced, thank you for the report! Link to the ticket to track: https://github.com/bryntum/support/issues/4042

All the best,
Alex