Search found 3268 matches

If i remove 'repopulateOnDataset : false' i get 'Uncaught (in promise) Error: Already entered replica'

Thanks for the report. It's a known issue. Ticket here: https://github.com/bryntum/support/issues/1913

Regarding your second issue. 2) For the issue with triggers being executed, the zip file also has "example-trigger.html". I've placed alerts on the changes / "update" action. If a user changes the event, I'd like the event to trigger. But if there's something in the backend that updates the event, I...
We've checked the steps you described against 4.1.0 version and found this error: https://github.com/bryntum/support/issues/2605 The stacktrace is different, so you probably have a different problem. Screensharing is not included to the forum support. This can be done as a paid service: https://www....
Hello! Lets check issues one by one. 1) For the "revertChanges" issue, I've attached "Examples of Issues.zip" to provide an example. To setup, put the example.html file in the zip file in a directory, create an "import" directory in the same directory, and inside of that, put all of the SchedulerPro...

It was added in version 3.1.2 (2020-04-17). Please consider upgrade to the latest version (4.1.0 is coming). Otherwise, you need to read the sources and check how the Widget column works. Maybe you can make the button read only, and style it in CSS to do not look like a button, but just a simple text.

What Scheduler Pro version is it? Try 4.1.0-beta-3 or nightlies? Also ProjectModel should be used as a centralized data storage when using Pro version. It extends the CrudManager functionality: https://www.bryntum.com/docs/scheduler-pro/#guides/schedulerpro/project_data.md If the issue is still repr...
I see in your project data the start date is missing, but end date is defined. Is it intentional? You have Backward scheduling enabled? And I'm not sure what "progressModel" and "percentDone" are in your data. Снимок экрана 2021-04-01 в 18.07.37.png Note, in forward scheduling (default) tasks are sc...

Reading your code snippet carefully I paid attention you're changing subGridConfigs. This is a config. It is not supposed to be changed dynamically.

And the subGrids getter you can simply replace with the getSubGrid function.

// gantt.subGrids.locked => gantt.getSubGrid('locked')

Please read the docs: https://www.bryntum.com/docs/grid/#Grid/feature/export/PdfExport#loading-resources
Loading resources chapter. You need to copy resources and set a path to them.